02.02.2023
Welcome to KAEFER Middle East
*total hours for 2020
Scaffolding structure: 1,406,800 m³ Scaffolding platform: 329,200 m² Scaffolding suspended: 60,000 m²
Scaffolding structure: 618,314 m³ Scaffolding platform: 96,880 m² Scaffolding suspended: 12,600 m² *total hours until 2020
Insulation: 11,280 m² Surface Protection: 16,800 m² Scaffolding Structure: 220,800 m³ Scaffolding Platform: 38,400 m² Scaffolding Suspended: 76,800 m² *total...
Green Field: Piping Hot (MW + Aluminum): 25,555 m² Piping Hot (MW + Aluminised Steel): 6,403 m² Brown Field: Piping...
Passive Fire Protection – Fendolite (33.5 mm): 14,203 m² Passive Fire Protection – intumescent (12.2 mm): 1,993 m² Structural Painting...