Crude Flexibility Project
The Crude Flexibility Project is an ongoing mega project in the United Arab Emirates. KAEFER’s activities are located in two...
Welcome to KAEFER Middle East
The Crude Flexibility Project is an ongoing mega project in the United Arab Emirates. KAEFER’s activities are located in two...
This project represents the biggest scaffolding maintenance contract for KAEFER in Qatar to date. It is also the first LEAN...
*total hours for 2020
Scaffolding structure: 1,406,800 m³ Scaffolding platform: 329,200 m² Scaffolding suspended: 60,000 m²
Scaffolding structure: 618,314 m³ Scaffolding platform: 96,880 m² Scaffolding suspended: 12,600 m² *total hours until 2020
Insulation: 11,280 m² Surface Protection: 16,800 m² Scaffolding Structure: 220,800 m³ Scaffolding Platform: 38,400 m² Scaffolding Suspended: 76,800 m² *total...
Green Field: Piping Hot (MW + Aluminum): 25,555 m² Piping Hot (MW + Aluminised Steel): 6,403 m² Brown Field: Piping...
Passive Fire Protection – Fendolite (33.5 mm): 14,203 m² Passive Fire Protection – intumescent (12.2 mm): 1,993 m² Structural Painting...